Clearing the Site.
Earth work excavation in ordinary soil
to the required depth and width as specified with all leads
and lift etc. for footing
Supplying and providing P.C.C. 1:5:10 in 15 cm thick
Supplying and casting vibrate R.C.C 1:2:4 using 20mm
granite broken stone.
Supplying and casting vibrate R.C.C.
1:1:5:3 using 20mm granite broken stone for column, beam and
roof slab including cost and conveyance of all materials,
formwork, steel and its bending watering and curing etc
Complete as shown in the detailed drawing.
a) Ground floor
b)
First floor
Supplying and providing brick work masonry in c.m 1:6 for
super structure including cost of all materials, labour
formwork and curing etc. complete.
a) Ground Floor
b) First Floor
Providing 12mm thick plastering in c.m 1:5 on exterior and
interior faces of walls including cost of all materials,
labour, formwork and curing etc. complete.
a) Ground floor
b)
First floor
Providing 9mm thick plastering in cm. 1:3 for ceiling of
slabs, sunshade & staircase including cost of all materials,
labour, formwork and curing etc. complete.
a) Ground Floor
a) First Floor
Supplying and casting 10cm thick flooring with P.C.C.
1:5:10, using 40mm hard granite broken stone including cost
and conveyance of all materials, labor charges and curing
etc. complete. Ground floor.
Supplying and providing cement plaster surface with red
oxide finish for floor in cm. 1:4 including cost of
materials, labor and polishing charge etc. complete.
a) Ground Floor
b) First Floor
supplying and laying good quality glazed tiles for floor of
bathrooms.
a) Ground Floor
b) First Floor
Supplying and fixing good quality glazed tiles for floor of
bathrooms and Houlu
a) Ground Floor
b) First Floor
Supplying and fixing Doors and windows with good quality
Teak wood including all fittings, fixing charges and also
polishing the wooden surface to good finish etc. complete.
a) Ground Floor
Door
Window
b) First Floor
Door
Window
Supplying and fixing Doors and windows with good quality
Teak wood including all fittings, fixing charges and also
polishing the wooden surface to good finish etc. complete.
a) Ground Floor
b) First Floor
Supplying and fixing steel grill work in secondary Masjid
and pipe room
a) Ground Floor
b) First Floor
Supplying and providing White wash over plastered surface
two coats including cost of all materials, labour charges
and curing charges etc. complete.
a) Ground Floor
b) First Floor
Plumbing and sanitary fittings
Electrification
Miscellaneous and cost of 3 Minars of Masjid
Total
|
100
30.00
73.00
147.00
140.00
49.00
45.00
1200.00
900
1000.00
900.00
50.00
500.00
450.00
80.00
40.00
275.00
50.00
13.00
300.00
15.00
30.00
17.00
3.00
40.00
25.00
200.00
1800.00 |
M3
M3
m3
m3
m3
m3
m3
m2
m2
m2
M2
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
No.
No.
m2
m2
m2
m2
LS
LS
LS
|
150.00
3250.00
13000.00
12750.00
13000.00
5000.00
5300.00
130.00
155.00
150.00
175.00
3250.00
250.00
300.00
500.00
575.00
500.00
575.00
4500.00
5000.00
5500.00
6000.00
1500.00
1500.00
600.00
700.00
25.00
35.00
|
10000.00
15,000.00
97500.00
949000.00
1874250.00
1820000.00
245000.00
238500.00
156000.00
139500.00
150000.00
157500.00
162500.00
125000.00
135000.00
40000.00
23000.00
137500.00
28750.00
58500.00
150000.00
82500.00
180000.00
25500.00
4500.00
24000.00
17500.00
50000.00
63000.00
200000.00
300000.00
100000.00
7759500.00 |